The
concrete lid of the existing subterranean boiler building,
located in the heart of campus, was failing structurally
due to age and students gathering on top
-
This
project consisted of resurfacing the lid with
heavy duty traffic coating sealant, providing ADA access
to the lid and replacing a small portion of the roof
deck
-
Concrete
stairs, walkway and fire line were added adjacent to the
building
-
A
heavy timber student pavilion with water and electricity
is included in the project, serving as a
speaking area and stage for student and community events,
replacing an aging gazebo that has served this function
for many decades.
|
|